CAMPAIGN: ELECTRIC EEL
PHASE: PREPARATION
OBJECTIVES:
Provide stable, low emission or emission-free electricity for the entire population.
PREREQUISITES:
None
DIRECTIVES:
- Construct geo-thermal power plants.
- Construct solar panel farms.
- Construct wind turbine farms.
- Facilitate the installation of solar-panel / solar membrane windows in all applicable modern construction.
- Construct hydro-electric power plants.
- Construct tidal power plants.
- Construct thorium-based power plants.
- Extract thorium and/or other suitable nuclear material from resource rich deposits.
- Fund research for cleaner consumption of coal in power plants.
- Construct coal power plants (for backup power supply only).
SCHEDULE:
Commence: As soon as possible
Duration: ongoing
RESULTS:
To be determined
Home | Strategy | Constitution | Campaigns | Our Organisation | Donate | Join