CAMPAIGN: ELECTRIC EEL

PHASE: PREPARATION

OBJECTIVES:

Provide stable, low emission or emission-free electricity for the entire population.

PREREQUISITES:

None

DIRECTIVES:

  1. Construct geo-thermal power plants.
  2. Construct solar panel farms.
  3. Construct wind turbine farms.
  4. Facilitate the installation of solar-panel / solar membrane windows in all applicable modern construction.
  5. Construct hydro-electric power plants.
  6. Construct tidal power plants.
  7. Construct thorium-based power plants.
  8. Extract thorium and/or other suitable nuclear material from resource rich deposits.
  9. Fund research for cleaner consumption of coal in power plants.
  10. Construct coal power plants (for backup power supply only).

SCHEDULE:

Commence: As soon as possible

Duration: ongoing

RESULTS:

To be determined